Made it! I got the first slab poured. We did not mix the cement ourselves this time. The cost was about US $125 and $30 for the rebar, $7 for tying wire... total cost about $162. This was my first time to do everything. It turned out well. Next I will do the slab in the center where the drain pipes run.
Joey and Giffy helped me repaint the front of the building where are classrooms are. It looks so much better.

No comments:
Post a Comment